Countdown to shoot
Feb. 20th, 2012 09:05 amI hope to nail the Second Life set, so that I can do the shoot to make the panels for part 1 of Real Life Trips tomorrow.
The bulk of the of the missing items has now been re-delivered, though I have a few things to make as well. But it means that the set can finally be dressed properly. The sandboxes I use tend to have an 8-12 hour rezz period. After that everything gets de-rezzed and returned to "Lost and Found". I may go for one with a 12 hour period because of that, though hopefully everything would be done in just under four. Thing is that the avatars have to be dressed and posed as well,
The bulk of the of the missing items has now been re-delivered, though I have a few things to make as well. But it means that the set can finally be dressed properly. The sandboxes I use tend to have an 8-12 hour rezz period. After that everything gets de-rezzed and returned to "Lost and Found". I may go for one with a 12 hour period because of that, though hopefully everything would be done in just under four. Thing is that the avatars have to be dressed and posed as well,
That means today I:
- Organise existing props;
- make extra props (mostly magazines, bills and clutter);
- finalise the storyboard; and
- if needed create extra poses.
Two overbed tables I made as props for the other set.